SV-DN project

2l-image-Sao-Vang-and-Dai-Nguyet-Gas-and-Condensate-Fields-Development

The Yellow Diamond Project (SVDN) is owned by Idemitsu Kosan, which is also the operator through a product sharing agreement (PSC) between PetroVietnam, Idemitsu Kosan and Inpex.

The SVDN project consists of 02 Sao Vang and Dai Nguyet mines in blocks 05-1b and 05-1c respectively in the Nam Con Son basin, 350km south-east of Vung Tau, at a depth of about 120m. Phase 1 includes a central processing unit (CPP) called Golden Star that connects the mine pipe system with wells. Upper Topsides weighs nearly 14,000 tonnes, jackets and piles weigh about 15,000 tonnes. The first gas plan for the Gold Star CPP is expected to be completed by the third quarter of 2020.

Tam Phuc provided IMI-CCI control valve and B&R pressure relift valve for project.